BUS voucher applications are submitted after the quote is accepted but before installation starts - managing the timing window across multiple live jobs is difficult without a clear status tracker for each grant application.
MCS 015 heat loss calculations must be completed to a specific standard and stored on file - paper-based site surveys get lost or are incomplete, creating delays at MCS certificate registration.
Equipment lead times for heat pump units and cylinders can stretch to 4-6 weeks - without a purchase order linked to the job's installation date, procurement slips and voucher expiry dates are missed.
See it live
Want to see this workflow in Zigaflow?
Book a demo and we'll run through your exact process live.
Book a free demo →Build your own workflowAV - Corporate Conferencing Room Installation
How to manage a corporate AV conferencing room project from site survey through design approval, hardware procurement, first and second fix installation, commissioning, and client sign-off.
AV - Digital Signage Supply and Installation
Covers the full workflow for a digital signage project: from enquiry and site survey through hardware procurement, on-site installation, CMS setup, and signed commissioning handover. Keeps delivery dates, kit lists, and sign-off in one place.
AV Dry Hire Kit Dispatch and Return
Covers the end-to-end process for an AV hire business managing dry hire kit - from deposit collection and kit prep through signed dispatch, return inspection, damage resolution, and final invoicing.