A kit arrived at the customer with one defective component line because assembly started before all deliveries had been inspected, requiring a costly partial rework and reshipment.
Freight was quoted as a flat rate and the run included 140 residential addresses, resulting in $630 in unrecovered residential surcharges absorbed as an overhead cost.
The customer invoice was raised before all supplier invoices had been received, so the job margin was unknown at billing and two supplier costs arrived the following week at above-PO values.
See it live
Want to see this workflow in Zigaflow?
Book 30 minutes with Tim and we'll run through your exact process live.
Book a free demo →Build your own workflowAV Dry Hire Kit Dispatch and Return
Covers the end-to-end process for an AV hire business managing dry hire kit - from deposit collection and kit prep through signed dispatch, return inspection, damage resolution, and final invoicing.
Audio-Visual - Managing an AV Equipment Hire Job
A complete operational workflow for AV hire businesses, covering written booking confirmation through kit preparation, dispatch, show-day additions, kit return and condition check, and same-day invoicing.
AV System Integration - Running the Commissioning and Handover Process
A structured workflow for AV system integrators running the commissioning and handover phase of an installation project - covering pre-commissioning checks, component and signal flow testing, end-user acceptance, handover pack compilation, and same-day invoicing. Ensures the commissioning milestone is documented, signed off, and invoiced on the day it is achieved.
Got a different workflow?
Describe your process in plain English and we'll map it to Zigaflow in seconds.
Build my workflow →